Dependable Turbines Ltd.

 

 

Made in Canada

 

Rock Creek Hydroelectric Project

Mackay, Idaho, USA

Statistics:

bullet

Turbine: double nozzle Pelton

bullet

Generator: 390kW Potencia @ 900 RPM

bullet

Rated head: 164m

bullet

Rated flow: 0.3m3/sec

bullet

Commissioned: 2019

Water in Rock Creek is diverted into a 20-inch diameter buried pipeline for about 3740m with a drop of about 186m. At the end of the pipeline the flow is diverted to irrigated farmland. The existing water intake facility and the existing pipeline were modified for power generation (USDA subsidies for hydro power on existing irrigation systems). The generated power is being sold to a local utility company.  

   

Two Nozzle Pelton Hydro Turbine Generator

Two Nozzle Pelton Hydro Turbine Generator

Wall Mounted Hydro Turbine Switchgear and Control Panels

Wall Mounted Hydro Turbine Switchgear and Control Panels

   
Pelton Hydro Turbine Powerhouse

Powerhouse

Hydro Power Plant Switchyard

Switchyard

 

 

Back to Projects page.

Back to Top

Dependable Turbines Ltd. – 17930 Roan Place – Surrey, B. C. Canada V3S 5K1
Phone (604) 576-3175 – Fax (604) 576-3183 – Email: sales@dtlhydro.com

 

© Copyright 2019 Dependable Turbines Ltd.  All rights reserved.