Ross Creek Hydroelectric Project
Pemberton, British Columbia, Canada
Statistics:
 |
Turbine: One single nozzle Pelton |
 |
Generator: One 150kW single phase synchronous generator @
1200 RPM |
 |
Rated head: 305m |
 |
Rated flow: 0.057m3/sec |
 |
Commissioned: 2012 |
This is one of two micro hydro power plants built for the supply of
electricity to an equestrian center, which consists of three large farm
buildings and one house. The two plants are within one kilometer
of each, but are linked and run together into the same off-grid power
line. In addition, the plants are able to run independently should
one be shut down. The systems are fully automatic, capable to be
monitored, started and stopped remotely.
|